RFP/RFQ/IFB/Bid Results and Plan Holders

Print

E-Subscription Envelope Subscribe for E-mail Updates

Public Works Requests for Quotes, Proposals and Invitation for Bid are now posted at www.bidsync.com.

If you are not registered with BIDSYNC, please Click Here for instructions on how to register.


RFP, RFQ & IFB:
County Road (CR) 27 Rehabilitation Project
General work description, as detailed on the construction plan:
Work includes, but is not limited to: Place construction area signs and road detour signs for road closure. Pulverize existing road, move material and grade to final FDR grades. Add portland cement to pulverized road surface, mix and compact in place. Overlay FDR surface with HMA. Remove existing culverts and headwall. Place RCP drainage culvert. Place shoulder backing. Place pavement stripes, pavement markings, pavement markers and reset monuments.

County Road 98 & 29 Tree Mitigation & Habitat Restoration Project
 Pre-Bid Attendee List
General work description, as detailed on the construction plan:
Work includes, but is not limited to: Tree mitigation work at the Woodland Reiff Site includes, but is
not limited to: clearing plant location areas; field-identify plant locations; construct mulch trail;
furnish and install native plant stock; design, build and operate irrigation water supply system;
fabricate, install and maintain habitat restoration signs. This work includes 3 years of tree mitigation
plant establishment work beginning immediately after the Engineer has accepted initial plant
installation.
 
 CR 86A Bridge Replacement Project - Cottonwood Slough, Bridge 22C-0184
 General work description, as detailed on the construction plan:
Work includes, but is not limited to constructing a new single span cast-in-place reinforced concrete flat slab bridge approximately 65 feet long and 29 feet wide.  The work includes demolition and disposal of the reinforced concrete bridge (Bridge No. 22C-101), imported earthfill for new roadway approaches and driveway conforms, shoulder backing, striping, guardrails, furnishing qualified biological pre construction surveys, and coordinating utility work.

BID RESULTS:
County Road (CR) 27 Rehabilitation Project
Bid Results
County Road 98 & 29 Tree Mitigation & Habitat Restoration Project
 Bid Results

PLAN HOLDERS LISTS:
County Road (CR) 27 Rehabilitation Project
Plan Holders List
County Road 98 & 29 Tree Mitigation & Habitat Restoration Project
 Plan Holders List
 CR 86A Bridge Replacement Project - Cottonwood Slough, Bridge 22C-0184
 Plan Holders List

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.